𒁾Tablet (in Akkadian)
CodifypediaWe believe in Legends
Integrated with:
MethodPlace
Channels:
Subscription
You are not logged in
Login Register
KnowledgeDMS  - Ad    

Articles > PRINCE2 Change control technique

PRINCE2 Change control technique

Author(s)
lukasz
Exclusive

Login to read
0    

Showcase based on first 100 words:

PRINCE2 Change control technique

The PRINCE2 Change Control technique described in the 2005 version of PRINCE2 was adopted and adapted as a Issue and Change Control procedure in the 2009 guidance. The notion of a technique disappeared and the procedure was incorporated in the Change theme. The biggest change is arguably that the old technique was directly linked to PRINCE2 sub-processes (i.e. activities) as evidenced by its change control steps, in contrast to the new procedure. Both approaches will be discussed in this article.

In both cases the trigger are new Issues. All changes to a project are

...

Sample Picture

Subscribe to read the full article!

© 2023 codifynet